Offshore
Renewables Services

Your offshore renewables, marine services, and critical support team.

Project Management

For Ports and Harbors:

Site layout plans, suitability surveys, resilience studies, safety plans, regulatory compliance.

For Vessels:

Suitability surveys, operations review, deck layout plans, FMEA rereview, manning/cabin verification

Marine Warranty

Cable manufacture audits, onshore transportation verifications, Safe storage confirmation,​ loadout and sail-away attendance, jacket installation, subsea construction, heavy lift, turbine installation, cable lay, engineering support & verifications.

Client Representation

Verification of cable route, safe handling of equipment, allowable limits for heavy lifts and installation.

CVA Capabilities

Independent third party appointee to certify design, fabrication, and installation of BOEM following applicable U.S. Code of Federal Regulations.

Our engineers and surveyors have years of knowledge and global experience.

*CVA Capabilities dependent upon Developers request to BOEM.

More Services

IV Capability/ Suitability Review

Feedering Workability

Wind Vessel Conversion

Bid Tendering

Installation Efficiency

Operational Excellence

Port Resilience Study for North Carolina State Ports Authority

Click to read more about our goals and deliverables for this project.

Goals

1. Identify the major catastrophic failures that would lead the port to closure, assess the estimated time needed to resume operations based on current procedures, response, and infrastructure in place. 

2. Quickly resume operations, identify areas needing improvement, which when improved would lead to a more resilient port, and resume revenue gain.

Deliverables

1. Identified possible catastrophic failures of the port and surrounding areas that would affect the port.

2. Identified consequences of these failures and the current infrastructure, measures, and response procedures in place to mitigate these failures.

3. Delivered document of findings and assessment of resilience to the main catastrophic failures.

Ensure Safety of Personnel by Providing Marine and DP Expertise Onboard

Click to read more about our goals and deliverables for this project.

Goals

1. Oversee the DP operation during continuous gangway connections.

2. Verify competence of personnel and adherence to Operating Guidelines.

3. Assess inventory or critical spares and proper preventative maintenance procedures. 

4. Identify trends over time that would lead to unplanned gangway disconnections and downtime.

Deliverables

1. Produced daily progress report.

2. Produced daily DP assurance report.

3. Conducted daily debrief call to shore-side management.

4. Submitted weekly photo summary.

5. Conducted weekly vessel hygiene inspection.

6. Conducted weekly safety assessment.

Advise Client on the Local and Regulatory Landscape Pertaining to a U.S. Cross-Lake Cable Lay

Click to read more about goals and deliverables for this project.

Goals

1. USCG, EPA, and local approvals for Cable Lay Vessel

2. Plan approval

3. Operational procedures.

Deliverables

1. Liaised directly with USCG and EPA agencies regarding overall cable lay plans.

2. Provided operational procedures, vessel details, and cable lay route to local regulatory agencies.

3. Successfully received approval of cable lay plan.

4. Successful cable lay with no regulatory interruptions or delays.